CONTRACTORS - WHEN YOU DIG

When you start work:
- Always hand dig near to services,
use spades and shovels rather than picks, pins or forks.
- It is possible that cables or pipes
may be embedded in concrete. Electricity cables embedded in concrete MUST
either be made 'dead' before the concrete is broken out or another safe
way of working agreed with NIE.
- Services are sometimes protected
by concrete, polythene or earthenware tiles or a marker tape may be laid
above the service - this is a useful indication of the presence of the
service, you should avoid disturbing any tile or tape to expose the service
if possible. There are however, many services in existence, that have
no tiles, tapes or other physical indication of their presence on site.
The Right Way to Dig!
|
Always dig by hand and use cable tracing equipment
when working close to underground electricity cables. |
 |
|
Next: Tipper lorries and mobile plant
top
|
|